From: route@monster.com
Sent: Sunday, May 01, 2016 7:44 AM
To: hg@apeironinc.com
Subject: Please review this candidate for: Dispatch Clerk
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
DANNY ROSS
Irving TX 75039 Dross2861@gmail.com 619 846-8772 PERSONAL
SUMMARY
Perform
extremely well within a team environment and possess time tested follower
ship and leadership skills. Skilled in team environments, contributing to
professionalism, mutual success and team cohesion. Have extensive
international experience and have extensively worked with individuals in the
U.S. originating from all corners of the globe. I have been highly productive
at all levels of responsibility ranging from leading complex multi
departmental projects to completing assigned tasks as an individual engineer.
Most
recent assignments were; 1. Reston VA, LTE RF Design, Tri-Band, 97 markets
across the US. 2. Overland Park KS, LTE RF Design, 2100Mhz, Tennessee markets
(Nashville, Memphis, Chattanooga, etc.), 3. Carolinas, LTE RF Design, AWS,
Small Cell (micro single node/DAS multi node) SKILL SUMMARY
· Experience in Network Integration Engineering, RF Design
and RF Optimization RF
Design Engineer: Site visits, site candidate information packages (SCIP)
evaluations. RF
Design Tools: Legacy Planet, Planet EV 4.4, Mentum Planet 5.5, Planet 5.7,
Wizard, EDX, NOX, Fusion, DMS, Geoplan. Siterra
data input responsibilities SCIP through launch. Construction drawings,
structural analysis, site safe FAA certificates. Cabling, Antennas, site
information, etc. RF
Engineering representation at town hall meetings and municipal zoning
hearings. · Performed RF Design, predictions, analysis and statistics
generation for in building and on street for LTE FDD and LTE TDD markets. · Excellent interpersonal skills spanning cross cultural
teams · Customer delivery and presentation, project delivery on
budget and on schedule, identifying potential hurdles before they occur and
developing multiple options to present to cross functional teams. · Hands on experience with GSM, CDMA, 1xEVDO, UMTS, WiMax,
LTE. · Experience in Network Integration Engineering, RF Design
and RF Optimization. · Software utilized GeoPLan, CAIT, Pcubed, Agilent &
Actix, TEMS Deskat and Investigation, Grayson Invex 3G, Windcatcher, RFO,
Planet 4.4, Wizard, dB Planner, Clearvision, Siterra, CDF Editor, NCF Editor,
MAPCI, BSMCI, CLIAPP, Mentum Planet 5.5/5.7, Atol, Fusion and NSAT. · Town Hall Meetings, Zoning Hearings, Site Acquisition,
SCIP process, Zoning Drawings, Construction Drawings, Zoning Plots, coverage
and capacity analysis, etc. · KPI, Call flow analysis, root cause, layer 3 messaging,
etc. · International: successful assignments in China, Russia,
Finland, Turkey, France, Korea, Saudi Arabia, Kuwait, Nicaragua, Japan and
Peru. EXPERIENCE Telnet Consultant Verizon Wireless LTE Small Cell RF Design Tennessee/Carolinas May 2015 –
Present LTE
Small Cell Design: MicroCell (Single Node) and DAS (multi Node): Utilized
GeoPlan RF Coverage Design Tool, RTT traffic histogram tool, SPLTE Twitter
Heat Map Tool, Google Earth Pro, Capacity trigger sector KML files, Site
tracker, KAPPA, ELPT traffic/kpi, Netwokflow, siterra etc. Evaluated
capacity triggered sector coverage areas. Determined high capacity areas
(search rings), identified structures (right of way utility poles, etc) for
small cell candidate locations, leveraging MLAs with large retail locations
(private property self-performing), right of way utility and traffic light
poles (right of way turnkey). Performed antenna selection based on coverage
requirements, performed propagation modeling and plots with Geoplan. Created
design packages, participated in design review meetings. Performed Siterra
entry for search ring and candidate information. LCC Consultant LTE RF Optimization Nov 2014 – Mar 2015 RF Optimization, LTE, CDMA, EVDO (800, 1900
and 2500) Created cluster boundaries and drive routes
(Planet Tab files). Post process and Analyze cluster drive test
data utilizing Windcatcher. Analyzed
UE events (CDR, CFR, IRAT, etc), Layer 3 messaging, coverage indicator plots
(RSRP, CINR, PCI, Band, Pilot PN, Ec/Io, Dominant
Ec, Mob Tx Power, etc. Create/present drive test reports. Created
cluster optimization closeout packages/reports w/KPI graphs, event analysis,
etc. and submit change requests. Created
market level weekly reports detailing CDR, CFR, Tonnage, IRAT%,
attempts/successes, sec & ue TPuts, band load balancing, etc. Utilize
Tableau and RF Cockpit exports for weekly market KPI reporting and graphing. PanAsia: ConsultantOverland Park KS, Feb
2014 – Oct 2014 LTE TDD/FDD RF Design Mentum Planet 5.7 RF Design: LTE 2500 TDD (macro)/LTE 1900
FDD (small cells) LTE 2500/TDD Macro Memphis and Nashville Selection/kill D1 (on air Sites), D2 (planned
sites), proximity/collocation comparison site selection (Nashville and
Memphis). Planet project D2 site configurations
setup, sectors, antennas, Parameters, Ant electrical, Ue type,
Geodata, etc. Baseline site configurations and parameters
established/edited. Created weighted traffic maps (erlangs
& pops), Analysis “Areas of Interest”. Ran (30m, 10m) predictions for appropriate
plan of record sites/groups. Ran (30m/10m) Baseline Analysis, RSRP, Best
Server, C (N+I) Generated pre optimization C (N+I) Baseline
statistics Created optimization profiles,
optimizations and edited site optimization Constraints and settings Ran ACP, audited optimization changes and
implemented. Generated post optimization C (N+I) post
ACP statistics Generated sector PCI and PRACH, verified
reuse distances. Created market level reports and submitted
for joint review. Verified CIQ data correctness, generated
exports for RFDS Creation and Uploaded to Siterra. LTE 1900/FDD Small Cell Design Houston and Phoenix Design based on macro cell Coverage gaps
and Capacity congestion. Coverage Gap Classification: Excluded
Macro, Micro, Combined Micro and Excluded Micro. Capacity Congestion: based on peak
throughput to maximum throughput. Macro cell congestion number of congested
occurrences weekly and and monthly. Classifications of “urgent”
and “critical” are analyzed. Timing advance data used to determine
locations for capacity Small Cells on a per sector basis InfoVista: ConsultantReston VA May 2013 –
Feb 2014 LTE RF Design 4G strategies Mentum Planet 5.5 ETL PB Spectrum Server
Administrator: Mentum Fusion Console, Mentum Fusion Network Online Explorer
and Data Manager Server Responsible
for: 97
LTE TDD 2500 markets/projects “All-Site” scenarios 97
LTE FDD 1900 markets/projects “All-Site” scenarios 97
LTE FDD 0800 markets/projects “All-Site” scenarios 79
LTE TDD 2500 markets/projects “On Air Date” scenarios Created
Mentum Fusion RF analysis templates, settings and parameters, site groups and
flags, environment sets and penetration losses by OEM and band, created
project scenarios and schedules and generated IB and OS prediction and
analysis layers RSRP, Best Server, C (N+I), TPUT and statistics viewable in
on-line explorer and published contours, grids, statistics to Network Online
Explorer and XML file folders. Processed
and/or repaired all markets/projects that failed to run in Fusion with Mentum
Planet 5.5. WAVSYS consultantPlano Texas10/2011 –
4/2013 ALU/AT&T UMTS Optimization Regional
Lead, RF Engineering Regional
engineering lead (MN, IA, NE, SD, ND). Pre-launch UMTS optimization. Perform
layer management, root cause analysis, coverage and performance analysis.
Responsible for customer interface and report delivery, parameter work order
creation and implementation, team and inter-departmental coordination for
optimization delivery. Met
every deadline, POR site count delivery and improved quality, earning first
ever positive customer feedback for ALU in these markets as per ALU regional
RF Manager. Communication Infrastructure Corp Santa Barbara, CA10/04
– 10/11 Ericsson Projects UMTS Optimization
Regional/Delivery Lead Notable
Assignments: US
Cellular Nationwide LTE deployment5/11-10/11 Pre/Post
launch delivery lead National
4th Generation LTE
deployment and optimization. Currently in planning and preparation stages,
creating processes shakedown and cluster tuning, SOW, resource planning,
inter-departmental coordination and ASP selections. Go no Go lite. AT&T
Zodiac Acquisition Project12/09
– 5/11 Pre
launch/post launch engineering national delivery lead and RF Project Manager. National
acquisition project with planned network launches from California to
Virginia. Responsible for CDMA spectrum carve planning and implementation
(Motorola and Nortel), E911 testing, UMTS pre launch and post launch
optimization, data/parameters and network configuration accuracy.
Coordinating and scheduling cross functional teams, deployment and coordination
of drive test team resources and overall scheduling to meet customer needs.
Presenting delivery reports to customer management and coordination of
internal cross functional “launch night” teams. Met all schedules despite
being staff at most times below 50% of projected staffing. Developed and
created plan to save customer from marketing mistake of shipping 130,000 UMTS
mobiles to subscribers with activation instructions before the network ready
date. Sold approximately $500,000 in add on sales for this project. Presented
29 cluster GNG reports and ppt analysis to customer in a single GNG meeting
lasting 11 hours. T-Mobile
Carolinas Project06/09 – 11/09 UMTS
Pre launch deployment and optimization lead Led
12 engineer pre launch optimization team for Carolinas market spanning 7
cities and surrounding areas. Delivered each phase ahead of schedule by
approximately a week, meeting KPI requirements for Greenfield UMTS launches.
A few months later at the end of January, the Carolinas market performance
was graded as the “Best in Class” 3G market nation-wide for T-Mobile. AT&T
Los Angeles Market09/08 – 03/09 UMTS
pre launch deployment and optimization lead Led
18 engineer pre launch optimization team for Los Angeles market. spanning zones
3 and 4 and surrounding areas. Delivered each phase on schedule, meeting KPI
requirements for Greenfield UMTS launches. Almost all L.A. cluster post
launch close outs occurred before allotted 30 days and very little NPI
activity was required for L.A. Zones 3 and 4 for which I was the lead. T-Mobile
NE New York/New Jersey 05/08 – 09/08 Pre
launch deployment and optimization Phase
0+ and Phase 1 cluster optimization and launch. Analyze drive test data with
Actix Spotlight and TEMS. Utilize RSCP, EC/IO, EC, Active Set Count, UE TX
Power plots from scanner and UE to determine corrective action for pilot
pollution, cell overshot, neighbor list tuning. Investigate drops and
failures playing log files, analyzing performance indicators, layer 3 messaging
and call flow. Recommend antenna azimuth and tilt changes and neighbor list
modifications submitting Change Requests. Communication Infrastructure Corp Santa Barbara, CA10/04
– 06/08 Director RF Engineering Services Projects: Clearwire
Project11/2006-08/2007 RF
Design WiMaxRF Design Engineer RF
network design of 132 search rings. Evaluated and ranked candidates. Worked
with site acquisition to finalize primary candidate selection based on
coverage predictions, site visits and candidate availability. Produced
zoning plots and represented engineering at zoning hearings in several
municipalities within the market. Utilized EDX design software and
Clearvision site database manager. Cricket
Project02/2006-08/2006 RF
Design CDMARF Manger/ Launch Team RF
network design and rip of 297 sites and search rings. Performed initial
search ring scrubs, identified and prioritized site candidates and created
initial search ring/site database in Siterra SDM. Created project/sites in
Planet EV utilizing client provided parameters. Generated plots, erlang
tables, determined number of carriers, etc. Worked with site acquisition,
construction, zoning personnel and attended management and status meetings.
Approved SCIPs, zoning drawings, construction drawings and RF configs. FCC,
FAA and AM tower detuning compliance. Reviewed structural analysis findings,
tower mod costs, etc. Represented engineering at town hall meetings and
zoning hearings. Utilized Planet EV, Data Manager, Agilant, CW test equipment,
Siterra, Site Safe and Air Space. Sprint
PCS Project10/2005-01/2006 EVDO
DeploymentRF5 EVDO Optimization Sprint
PCS Project11/2004-10/2005 RF
Optimization CDMARF5 Optimization Engineer Supported
CBRS migration/re-home over 400 sites. Post processed and analyzed drive test
data and PN plots for “fill in” site pre “On Air” testing. Analyzed drive
data, determine root cause for trouble areas, tested IBSHO boundaries, RTD
hand down boundaries and investigated PN coverage issues, etc. Analyzed OM’s,
layer 3, drive test data/plots, etc. Utilized Agilant, Actix, Windcatcher,
etc. Nortel Networks (China Unicom)
Qingdao, China 4/04 – 10/04 Senior RF Optimization Engineer Provided
RF engineering services to China Unicom for optimization of 1xRTT networks in
Qingdao, China. Performed ISSHO optimization of CDMA 1xRTT networks between
Qingdao and Yantai markets. Performed RF Cluster coverage optimization in
urban and rural areas of the Shandong Province. Goals were to fill in
coverage holes, off load capacity from busiest sites to lesser utilized sites
and to reduce pilot pollution and/or soft handoff to reduce demand on
capacity. Performed troubleshooting to resolve customer trouble tickets and
resolved many RF related issues including co-PN interference. Managed
drive test resources and determined appropriate drive routes. Collected and
analyzed drive test data. Monitored KPI via MTX OM’s, data from performance
NEM servers and BTS performance logs. Recommended antenna changes and
parameter changes to China Unicom to facilitate optimization Utilized
Agilent, Actix,dB Planner, Grayson 3G and CAIT drive test tools. Analyzed
drive data with Nortel RFO, utilized CDF Editor, CROS and other “In House”
tools to monitor and affect performance.
Monet
Mobile Networks
Duluth, MN2/03 – 3/04 RF Engineering EVDO
design, deployment, ATP and optimization. Oversee
network/field operations, RF engineering, site acquisition and construction
personnel. Designed, launched and optimized thefirst commercial 1xEVDO
networks in North America. Perform RF design and optimization of CDMA 1xRTT
and 1xEVDO wireless networks. First commercial EVDO networks in North
America. Utilize Agilant’s Wizard RF propagation/design tool, ericsson TEMS
investigation and Deskat, Qualcomm’s CAIT and PCubed software tools, Site
Master, etc. Conduct internal CDMA training for technical and customer
service personnel. Interface with Qualcomm & LG Electronics engineering
personnel. Conducted joint 1xEVDO field trials with largest dial-up Internet
service provider and conducting follow up user trials. Incode Telecom San Diego, CA11/02
- 2/04 Senior RF Engineering Consultant Projects: Cricket
Project RF Design CDMA Toledo/Sandusky Ohio Utilized
Planet (legacy) for cdma design and Agilant drive test equipment for NSAT
network acceptance application. Search ring, candidate, scip evaluation,
appropriate plots generated, zoning and construction drawings, etc. Voicestream
Project E911
SMLC Integration Network
Integration Engineering and acceptance testing of SMLC for E911 and Location
based services. Nextel
Project Test
Case Engineer Developed
and implemented Test Plan/Test Case Procedures for Motorola/Winphoria
presentation of CDMA 1xRTT push to talk (PTT) solution as alternative to iden
and Q-chat. Test conducted with Motorola handsets, Motorola RAN/ BTS and
Winphoria soft switch at Incode’s lab in san Diego Icon PSC Chicago, IL 4/02 - 11/02 Sprint PCS Project Senior RF Engineer CDMA optimization Perform
RF engineering, CDMA system optimization, parameter changes and re-design for
performance enhancement. Identified network problems (coverage, neighbor
lists, interference analysis) using software tools, BSM, MTX, SBS logs, RF
Optimizer, ePerformance web site, PlaNet and Agilent HP drive test data.
Monitored system performance indicators such as dropped calls, blocked calls,
access failures, hand off failures via MTX OM’s, BSM, and ePerformance web
site. Reduced dropped calls and access failures. Dallas Technology Group Dallas, TX 12/01 -
4/02 Nortel Contractor GSM Network Integration Engineer/ Nortel
Contract Nortel
Networks, Network Integration for Voicestream. On-site support at
Voicestream's Dallas NOCC. CNC Global Dallas, TX6/01 -
12/01 Nortel Contractor CDMA Network Integration Engineer/Nortel
Contract Performed
Network Integration and RF Engineering via Nortel for Verizon (CDMA) and
Voicestream (GSM). MCTA 2nd, 3rd and 4th carrier expansion. Dual BSC
expansion, MTX integration, BTS integration and re-homes, cut over services,
new market launch, troubleshooting etc. Experienced with Nortel MTX/MSC,
BSC/TCU, BSM, BTS and RF Engineering tools. Qualcomm Inc San Diego1/99 - 6/01 Senior Field Engineer/Globalstar International
deployment of CDMA mobile satellite communications Globalstar system.
Performed turn up and test of switching, BSC, radio sub-system and satellite
tracking antenna system. Pacific Coast Paging San Diego, CA4/98
- 11/98 Engineering Manager Responsible
for design, expansion, and improvement of RF coverage for simulcast BTS
network in San Diego MTA and build out of Tijuana network, providing cross
border coverage. Responsible for switching expansion into Tijuana providing
cross border numbers. Supervised field engineers, developed vendor
relationships and managed pager repair center. Metrocall Paging Tarzana, CA 7/95 -
4/98 RF Field Engineer Responsible
for continued improvement, expansion and maintenance of RF coverage for Los
Angeles, Bakersfield and Las Vegas markets. Supervised, managed and
implemented nationwide channel build out in Las Vegas market, meeting
deployment deadline despite delays in infrastructure shipment. United States Marine Corps Oceanside, CA 12/83
- 6/95 Communications Electronics Maintenance
Manager RF
Field Engineer, Supervisor and Manager. Managed RF maintenance facilities,
supervising 100s of field engineers and technicians in scores of
international locations, managed quarterly budgets, reports, workflow, and
field deployments. Trained, supervised and was responsible for professional
development of junior personnel. Manager and supervisor at various levels for
10 of 12 years. EDUCATION University
of California at San Diego6/2002 Electronics Engineering CDMA Certificate United States Marine Corp, Twenty Nine
Palms, CA6/1992 Electronics Engineering Technology Nortel Networks Richardson, TX •CDMA1200 RF Engineering Principles •CDMA1201 IS95 Standards •CDMA1202 RF Engineering Performance &
Optimization •CDMA1203 RF Engineering Handoff
Performance •CDMA1204 Network Engineering Traffic &
Capacity •CDMA802 BSM Navigation •CDMA803 BSC Operations & Maintenance •CDMA828 BSMCI Tools •GSM OM12 BSC Operations & Maintenance
OMC-R •GSM 0NE2 RF Optimization & Parameters Agilent FL, USA Wizard CDMA Design Essentials COMPUTER SOFTWARE SKILLS Agilent HP E-74xx, Actix, Wind Catcher,
Qualcomm CAIT & PCubed, Inno Wireless DR CDMA, Ericsson TEMS &
Deskat, PlaNet, Wizard, Nokia TOMS, Grayson Invex 3G (PC & Chassis),
Nortel RF Optimizer, Nortel MAPCI & NSAT, Mapinfo, MS Office, etc. |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Advanced |
|
|
|